nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A flow-based tabu search algorithm for the RCPSP with transfer times
|
Poppenborg, Jens |
|
2015 |
38 |
2 |
p. 305-334 |
artikel |
2 |
A rough-cut capacity planning model with overlapping
|
Baydoun, Georges |
|
2016 |
38 |
2 |
p. 335-364 |
artikel |
3 |
A sequential procurement model for a PPP project pipeline
|
Clerck, Dennis De |
|
2015 |
38 |
2 |
p. 427-457 |
artikel |
4 |
Editorial “Project Management and Scheduling”
|
Kolisch, Rainer |
|
2016 |
38 |
2 |
p. 279-281 |
artikel |
5 |
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions
|
Nattaf, Margaux |
|
2015 |
38 |
2 |
p. 459-492 |
artikel |
6 |
Machine scheduling in underground mining: an application in the potash industry
|
Schulze, Marco |
|
2015 |
38 |
2 |
p. 365-403 |
artikel |
7 |
New formulations for the setup assembly line balancing and scheduling problem
|
Esmaeilbeigi, Rasul |
|
2016 |
38 |
2 |
p. 493-518 |
artikel |
8 |
On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
|
Schnell, Alexander |
|
2015 |
38 |
2 |
p. 283-303 |
artikel |
9 |
Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
|
Bianco, Lucio |
|
2016 |
38 |
2 |
p. 405-425 |
artikel |
10 |
Two-machine open-shop scheduling with rejection to minimize the makespan
|
Zhang, Liqi |
|
2015 |
38 |
2 |
p. 519-529 |
artikel |
11 |
Worst-case analysis of the LPT algorithm for single processor scheduling with time restrictions
|
Braun, Oliver |
|
2016 |
38 |
2 |
p. 531-540 |
artikel |